Five things to check before civil work starts on your site
Half an hour of checking before the first wall comes down saves the two most expensive weeks of any project.
Civil work is the point of no return. Once a wall is down or a floor is chipped, every decision after it is more expensive. These five checks take an afternoon and routinely save a fortnight.
1. Confirm which walls are structural
Get it in writing from someone qualified, not from a mason's opinion on site. If the building has drawings, read them. If it does not, a structural engineer's visit costs less than one day of stopped work.
2. Check the society's permissions and hours
Many buildings restrict work hours, ban weekend work, require a deposit, and prohibit certain changes outright. Find out before the crew arrives, not after a complaint stops them.
3. Trace the existing plumbing and wiring
Know where the water lines and the conduits actually run before chasing a wall. A single cut riser can flood two floors and turn a small renovation into an insurance conversation.
4. Test the waterproofing plan against the floor levels
Wet areas need a level drop and a properly turned-up membrane. Retrofitting that after tiling means removing the tiling.
5. Freeze the electrical layout on paper
Walk the plan and place every point: switches, sockets, TV, router, geyser, chimney, bedside, mirror light. Moving a point after plastering costs ten times what it costs to add on the drawing.
And one more
Photograph everything before work starts, including meter readings and existing damage. It settles arguments that would otherwise have no evidence.